Industrial Design Fabrication & Manufacturing Of Any Earth Moving Equipment Parts

New and refurbishment of loader buckets, Z-Links, Toggle Links, H-Frames & manufacturing or fabrication of Body Parts ext

Replacement of earth moving equipment parts

Major Dragline Tub replacement on Marion 82020

“Out with the old in with the new” Complete dragline Tub/Base replacement.

Some statistics:

  • 69345 Total man hours worked
  • 317 Job Safety analysis
  • 45 P.T.O
  • 119 Confined space permits
  • 119 Hot work permits

 

Repairing Of Earth Moving Equipment Parts

Major repairs on loader buckets

Repairs and re-spray painting of front end loader bucket.

Repairs on Buckets

Major Repairs on 777 Load Bodie Buckets

Complete replacement of inside liner plates on two 777 buckets.

Repairing of earth moving equipment Parts

repairs on Z-Link

Crack repairs on Z-Link. The repairing of this cracked Z-Link required precision re-aligning before welding could be conducted and line-boring after to ensure all bores lined up perfectly.

Manufacturing of parts

Manufacturing of various Bell Equipment earth moving equipment Body parts

Manufacturing & Repairs on all body part on any earth moving equipment. Eg Load bins, Belly plates, Chasses, any bracket

Manufacturing of earth moving equipment Parts

Manufacturing of h-frames & Toggle links

Complete manufacturing of any H-Frames and Toggle links according to accurate manufacturers specs.

Assembling of earth moving equipment parts

Dragline tub assembling

Assembling of complete warfab tub for Marion 8200 dragline over a 3 moth project.

Maintenance on earth moving equipment parts

Maintenance on a Kobelco 850 Excavator bucket

Crack repairs done on a Kobelco 850 Excavator Bucket